Beam & Block by Liz & Matt Coates May.14.2006 4:06:52 pm On Friday, as well as finishing off the rest of the foundations, the concrete beams supporting the living room floor were placed and cemented in. The gaps between these are then filled with breeze blocks to form the ‘beam & block’ floor. There was a particular reason for doing the living room floor this way when the rest of the kitchen will have a traditional concrete floor. However, although this made sense when it was originally explained to me, I have since forgotten what it was. |
© 2006 Liz & Matt’s Home Extension Blog by Liz & Matt Coates www.coates.freeola.net/extension Liz & Matt Coates has posted 94 journal(s) in this blog. This blog is powered by OZJournals version 1.2 | Warning: fread(): Length parameter must be greater than 0 in /freeola/users/9/2/sr0364429/htdocs/extension/counter.php on line 29 views since 17/06/2006 |