A-Frame by Liz & Matt Coates Jul.02.2006 10:52:34 pm Earlier in the week a roof frame was erected at the east end of the building to allow the gable end to be built and they are now well on the way with this. There was a brief moment of confusion before they realised that the roof design is not quite symmetrical but they seem to have sorted this out now. There is a second gable end at the rear of the building and this is growing too. The next level of scaffolding platform will have to be added fairly soon. The plan is to be ready for the roofers to start in about 3 weeks time. |
© 2006 Liz & Matt’s Home Extension Blog by Liz & Matt Coates www.coates.freeola.net/extension Liz & Matt Coates has posted 94 journal(s) in this blog. This blog is powered by OZJournals version 1.2 | Warning: fread(): Length parameter must be greater than 0 in /freeola/users/9/2/sr0364429/htdocs/extension/counter.php on line 29 views since 17/06/2006 |