Liz & Matt’s Home Extension Blog

a journal by Liz & Matt Coates



From rumours to reality

by Liz & Matt Coates Sep.04.2006 12:24:10 am


The plumber arrived as promised for the meeting on Friday morning - only a little late.  He should be coming back on Monday to put in the pipework for the new bathroom so that it can be made operational before the old one is removed.

On Saturday morning, the roofers arrived at the same time as the rain.  They spent a lot of time sheltering in their van but in between showers they managed to get the rest of the roof felted.  We are now officially weatherproof so that the builders can get on with the rest of the internal floors and walls.  Hopefully the tiles will not be far behind.

roof felted

previous ¤ next

© 2006 Liz & Matt’s Home Extension Blog by Liz & Matt Coates
www.coates.freeola.net/extension
Liz & Matt Coates has posted 94 journal(s) in this blog.

This blog is powered by OZJournals version 1.2

Warning: fread(): Length parameter must be greater than 0 in /freeola/users/9/2/sr0364429/htdocs/extension/counter.php on line 29
views since 17/06/2006