Liz & Matt’s Home Extension Bloga journal by Liz & Matt Coates |
|
Slow progress by Liz & Matt Coates Sep.16.2006 10:59:49 am It’s been a busy week for both of us at work, but not so busy back at the house. Some more plasterboard has gone up in the bathroom, and most of the new wiring has gone in, along with boxes for the sockets and switches, etc. No further progress on the roof, which is now holding everything else up. He is supposed to be turning up at some point today but so far (10.50 am) there is no sign. |
© 2006 Liz & Matt’s Home Extension Blog by Liz & Matt Coates www.coates.freeola.net/extension Liz & Matt Coates has posted 94 journal(s) in this blog. This blog is powered by OZJournals version 1.2 | Warning: fread(): Length parameter must be greater than 0 in /freeola/users/9/2/sr0364429/htdocs/extension/counter.php on line 29 views since 17/06/2006 |