Liz & Matt’s Home Extension Bloga journal by Liz & Matt Coates |
|
Lots to report by Liz & Matt Coates Oct.04.2006 11:49:19 pm The bathroom suite arrived as scheduled on Tuesday but the plumber has not yet been to see it. It is now occupying the floor space that formerly belonged to the wall tiles, which have now moved into Emma’s bedroom. |
© 2006 Liz & Matt’s Home Extension Blog by Liz & Matt Coates www.coates.freeola.net/extension Liz & Matt Coates has posted 94 journal(s) in this blog. This blog is powered by OZJournals version 1.2 | Warning: fread(): Length parameter must be greater than 0 in /freeola/users/9/2/sr0364429/htdocs/extension/counter.php on line 29 views since 17/06/2006 |