Liz & Matt’s Home Extension Bloga journal by Liz & Matt Coates |
|
Half Term Week by Liz & Matt Coates Oct.25.2006 2:11:35 am On Friday, the upstairs was declared finished (or as near as we are likely to get for a while) and ready to be decorated. This week is half term week and, with uncharacteristically good timing, we had both booked the week off work at exactly the right time to get on with the job. We spent all weekend undercoating walls and priming woodwork in the new bedrooms and the girls all pitched in with considerable enthusiasm. More of the same followed on Monday and the electrician was here all day rewiring all of the downstairs lighting, moving and replacing switches and putting in network cables. |
© 2006 Liz & Matt’s Home Extension Blog by Liz & Matt Coates www.coates.freeola.net/extension Liz & Matt Coates has posted 94 journal(s) in this blog. This blog is powered by OZJournals version 1.2 | Warning: fread(): Length parameter must be greater than 0 in /freeola/users/9/2/sr0364429/htdocs/extension/counter.php on line 29 views since 17/06/2006 |