End of Week 28

by Liz & Matt Coates Nov.05.2006 11:37:06 pm


This week lots of exciting things happened.

The back door was fitted, finally making the extension secure.  This allowed a new doorway to be created by breaking through the kitchen wall so that the whole of the downstairs is now accessible.  The wall that used to be between the kitchen and conservatory was removed completely and the window between the new kitchen and dining room was converted into a new doorway.  Dust everywhere.

After this, a new stud wall was put up across the old kitchen to create the new downstairs toilet.  There was a little excitement on Friday morning when someone cut through a water pipe, but I think this was just a ploy to get the plumber to come to put the pipework in for the toilet.

previous ¤ next

© 2006 Liz & Matt’s Home Extension Blog by Liz & Matt Coates
www.coates.freeola.net/extension
Liz & Matt Coates has posted 94 journal(s) in this blog.

This blog is powered by OZJournals version 1.2

Warning: fread(): Length parameter must be greater than 0 in /freeola/users/9/2/sr0364429/htdocs/extension/counter.php on line 29
views since 17/06/2006